Eurobuild Ltd. is established in 2003 as by decision of Burgas District Court dated 14.07.2003 it has been entered with the Company Registry and started its business operation, which is developing in several directions: construction, production of concrete mixtures, production of precast reinforcement elements, production of metal structures and items, services with construction machinery and equipment, transportation of cargo, including oversized loads, and transportation of passengers.
Among the more significant projects, executed by the company in the period 2003 – 2010, are the construction of residential and non-residential buildings and their adjoining infrastructure (as hotel complexes "Marina Royal Palace" and "Marina Beach Hotel" within the territory of Dyuni holiday village, Sozopol Municipality 2003-2009), "Prestige city" residential complex with total built-up area of 20000.00 sq.m., Primorsko (2006 – 2007), hotel complex "Hermes", Tsarevo (2007- 2008), residential building "М+5", in quarter 52, L. Karavelov Str., Dimitrovgrad (2008-2010), "Park Mall Stara Zagora" Trade Centre, Stara Zagora (2007), etc.) and he execution of industrial construction projects (as Rolling mill workshop for "Stomana Industry" AD, Pernik (2006–2008), Repository for dry storage of processed nuclear fuel in NPP Kozloduy, town of Kozloduy (2007- 2009), Circulation cooling water pump station within the territory of TPP "AES Maritsa East 1", town of Galabovo (2008), etc.).
One of the most successful projects, completed in the period 2008-2009, was the Reconstruction of existing buildings and structures within Belene NPP. The Reactor Unit, Turbine Unit and larger part of the sub-projects (total of 16), which were not subject to integration in the new project at the Belene NPP site, were successfully dismantled using a unique technology which involved diamond tool cutting machines TYROLIT PPH25 RRP, TYROLIT PPH40 RRP, PELLEGRINI TDI 100 /12 01 - R 3 IN and core drilling machines HYDROSTRESS HCCB. 154 000 cub.m. of ferroconcrete were dismantled and 85 000 cub.m. of soil were excavated, removed and backfilled for a period of one year.
In the period between October, 2006 - October, 2010 in the territory of Maritsa East 1 Thermal Power Plant, near to the town of Galabovo, Eurobuild Ltd. has erected and operated a Concrete Batching Plant. There were located two mobile concrete batching plants, manufactured by Stetter GmbH, with capacity of 120 cub.m. per hour. 14 classes of concrete were produced there with predominance of the classes of higher strength, such as В30 S3, В35 S3, В40 S3, B45 S3.
The Concrete Batching Plant of Eurobuild Ltd. in the town of Galabovo was the main supplier of concrete mixtures used for the construction of the new Thermal Power Plant "AES Maritsa East 1" and during the above period 247 570 cub.m. of concrete mixtures which were produced and used.
In the following years the company has expanded its activities towards execution of infrastructural projects related to the construction, completion and reconstruction of sewer and water supply networks, pump stations, roads, street networks, fortification and protection of river banks and sea coastal areas, landscaping and has continued to invest in the development and the improvement of the qualification of its personnel, in the enlargement of its vehicle and construction machinery fleet and in the applying of modern methods and technologies for realization of qualitative and sustainable products and services in its sphere of activity.