Alexandria Club Hotel, comprising Blocks 1, 2, 3 and 4, three outdoor swimming pools, amphitheatre and sports ground, water supply and sewer branches for the building, town of Primorsko
Warehouse with repair shop, warehousing facility, car wash and offices, town of Burgas
Some of the projects, executed by Eurobuild Ltd. in the recent years, are:
2022 - Reconstruction of conducting water suppy system for town of Tran from transition reservoir to pressure reservoir V=2000m3, town of Tran;
2021 - Design and Construction of an Information Centre for Decommissioning, with total built-up area of 1173.80 sq.m., town of Kozloduy;
2020 - Residential building with shops, offices and underground garages with cornice elevation 16.60m, 18.00m, 21.00m and 30.00m with total built-up area of 10121.00 sq.m., city of Sofia;
2020 - Residential building with shops, offices and underground garages with cornice elevation 26.60m with total built-up area of 8479.00 sq.m., city of Sofia;
2020 - Alexandria Club Hotel, with identity number 58356.506.552, comprising blocks 1, 2, 3 and 4, three outdoor swimming pools, amphitheatre and sports ground, water supply and sewer branches for the building with total built-up area of 14311.00 sq.m., town of Primorsko;
2020 - Concrete complete transformer station (CCTS) 2х800 kVa, 20/0.4kV in regulated plot of land UPI XXXII, quarter 34 with identity number 58356.506.553 as per the cadastral maps of the town of Primorsko and low- voltage cables 0,4kV from Concrete complete transformer station (CCTS) - new to 5 main distribution boards, town of Primorsko;
2020 - Car service, centre for ATI (annual technical inspection) and retaining wall, situated in UPI XIV-516, quarter 23 on the plan of Industrial Zone "Sever" with total built-up area of 1360.25 sq.m., town of Burgas;
2019 - Autonomous photovoltaic installation on roofs of existing goat farm – Cattle-shed A and Cattle-shed with a milking parlour B with built-up area of 981.29 sq.m. and total installed capacity of 160,38kWp, town of Koprivshtitsa;
2019 - Warehouse with repair shop, warehousing facility, car wash and offices with total built-up area of 869.60 sq.m., town of Burgas;
2019 - Shrimp Farm with built-up area of 1734.00 sq.m., village of Bulgarsko Slivovo, Svishtov Municipality.
Other projects, executed by Eurobuild Ltd. over the years:
2003 - 2009 - Hotel complexes "Marina Royal Palace" and "Marina Beach Hotel" and development of their adjoining infrastructure within the territory of Dyuni holiday village, Sozopol Municipality;
2006- 2008 - Rolling mill workshop for "Stomana Industry" , town of Pernik;
2006- 2007 - "Prestige city" residential complex with total built-up area of 20000.00 sq.m., town of Primorsko;
2007 - "Park Mall Stara Zagora" Trade Centre, town of Stara Zagora;
2007- 2008 - Hotel complex "Hermes", town of Tsarevo;
2007 - 2009 - Repository for dry storage of processed nuclear fuel in NPP Kozloduy, town of Kozloduy;
2008 - Circulation cooling water pump station within the territory of TPP "AES Maritsa East 1", town of Galabovo;
2008 - 2009 - Reconstruction of existing buildings and facilities within the site of NPP Belene, town of Belene;
2008- 2010 - Residential building "М+5", in quarter 52, Karavelov Str., town of Dimitrovgrad;
2011 - 2012 - Reconstruction and finishing works of the park zone around the river bed of Topolitsa River in the central town area of the town of Koprivshtitsa;
2012 - 2013 - Extension of existing fodder workshop with module for the production of pressed vegetable oils, village of Bulgarsko Slivovo, Svishtov Municipality;
2012 - 2013 - New tank with capacity of 20000.00 cb.m. in Production "Transport and Storage of Petroleum Products" in the territory of "Lukoil Neftohim Burgas" Plc., on the land of town of Kameno, Kameno Municipality;
2013 - 2014 - Completion of sewer network and partial reconstruction of water supply network in the town of Sredets;
2013 - 2015 - Reconstruction with extension and additional storey of existing industrial building into a hotel for rural tourism, town of Koprivshtitsa, Sofia Region;
2014 - 2015 - Fodder production facility, silos, warehouses for soft products, warehouse for ready production, administration, pit and PP tank in the village of Yana, Kremikovtsy District, Sofia Municipality;
2014 - 2015 - Construction of water supply and sewer network and sewage pump station within the lands of Chernomorets, Sozopol Municipality;
2016 - Construction of two water slides with an open-air entertainment swimming pool, relax swimming pool for adults and restaurant (Aqua park) within the territory of Dyuni holiday village, Sozopol Municipality;
2016 - Sewage pump station "Ravadinovo" and pressure pipeline (penstock) in village of Ravadinovo, Sozopol Municipality;
2016 - 2017 - Construction of temporary access road to Radiana Site in the immediate vicinity of NPP Kozloduy, town of Kozloduy;
2018 - Construction of water pipeline for mineralwater from drilling source at mineral-bath in village of Barzia to mineral-bath in town of Berkovitsa, on the lands of village of Barzia and town of Berkovitsa, Montana Region;
2018 - Double technological tower for storage of chocolate in Factory for chocolate products - town of Svoge – Phase 2, town of Svoge, Svoge Municipality, Sofia Region;